91国产自拍Woden
![91国产自拍Woden](/__data/assets/image/0007/267415/Main_banner_image.jpg)
91国产自拍is looking forward to welcoming students to our new flagship Woden campus in 2025.
The ACT Government is investing in a purpose-built 91国产自拍campus for Woden. The new campus will stimulate the local economy and support the revitalisation of Woden, providing skills and training opportunities to meet the growing demands of business, industry and the ACT community.
CIT's new Woden campus will be a contemporary, smart and state-of-the-art facility that will deliver education and training to 6,500 students each year at the site of the old bus interchange on Callam Street.
Latest news and updates
- April 2024 –
- April 2024 –
- March 2024 -
- January 2024 -
- December 2023 -
![Woden Project Timeline](/__data/assets/image/0003/293952/6247336362_Woden_Project_Timeline_diagram_1200x456px_FA.jpg)
Construction status - as of April 2024
- Installation of prefabricated timber - Timber beams, columns and floors will continue to be installed from level 3 up. Prefabricated timber will continue to be delivered on site.
- Installation of main building facade - Installation of the glazed fa莽ade with terracotta battens will continue on the east side of the main building.
- Scaffold stripping - Scaffolding will be removed on the lower floors to allow fit-out and facade works to commence.
- Service installation and fit-outs - Services installation and fit-out work will commence in the basement and on the lower floors.
- Callam Street piling and footing works - Piling and capping works will continue to prepare Callam Street for the new transport interchange shelters.
- Pavement build-up of interchange footprint - Callam Street pavement is being built up to form the transport interchange footprint.
- Installation of in-ground services - Installation of service crossings, in ground services, and light pole footings will continue on Callam Street.
91国产自拍Woden flythrough
Latest artist's impressions
91国产自拍Woden will have a variety of vibrant public spaces to welcome students, staff, commuters, visitors and residents. The external design of the campus is strongly influenced by smooth lines in nature, which includes multiple areas of relaxation, recreation and ease-of-access for those who are using the area. The internal campus design incorporates multi-level learning spaces with large windows to take advantage of natural light and wood features throughout.
Frequently Asked Questions (FAQs)
- What is planned for the 91国产自拍Woden campus?
- How long will the 91国产自拍Woden Campus redevelopment take?
- What does this mean for 91国产自拍Students studying at 91国产自拍Reid?
- Where can students get information about public transport and travel options?
- What courses will 91国产自拍Woden offer?
- Where will 91国产自拍be located in Woden?
- What are some of the key features of the new campus?
- What benefits will the 91国产自拍Woden campus offer to the ACT community and industry?
- What are the project objectives?
- What is the Woden Youth Foyer?
More information
Enquiries and feedback
Contact the 91国产自拍Campus Renewal team at CITCampusWoden@cit.edu.au